Plaster pic fest
Saturday, January 30, 2010
Tuesday, January 26, 2010
Gyprock Delivered
We went for an Australia Day visit to our build and found insulation installed and gyprock delivered. We also found sandstone caps and posts installed.
Walk in pantry sliding door cavity installed
Coffered ceiling frame in media room
Sexy Jazz cornice for main living areas
Sandstone caps and posts ready for painting
Let the gyprocking begin!!!
Walk in pantry sliding door cavity installed
Coffered ceiling frame in media room
Sexy Jazz cornice for main living areas
Sandstone caps and posts ready for painting
Let the gyprocking begin!!!
Saturday, January 23, 2010
Electrical, air con and vacuum ducts roughed in
Lots of action this week. Electricals, air con and vacuum ducts have been roughed in. Gyprocking starts next week.
Air con duct in Dining room
This poor guy is installing the indoor aircon unit under our black tiles in 40 degree heat.
Right rear speaker cable in media room
Left rear speaker cable in media room
Vacuum ducting
Air con duct in Dining room
This poor guy is installing the indoor aircon unit under our black tiles in 40 degree heat.
Right rear speaker cable in media room
Left rear speaker cable in media room
Vacuum ducting
Subscribe to: